How to bridge a gap for a heavy duty pipe between 2 buildings?

Published on: 20 February 2025

Armaflo are one of Walraven’s key stockists and distributors of mechanical fixings. They recently worked with a customer to tackle the challenge of installing a heavy-duty pipe bridge—where traditional support systems simply wouldn’t suffice.

The challenge: Supporting heavy pipework across a wide span

The pipework ran along one building before spanning a significant gap to another. Standard strut channels weren’t viable in this situation due to:

  • heavy duty pipe bridgeLoad capacity – The pipe’s weight exceeded what traditional systems could support.
  • Span limitations – Additional support points weren’t feasible given site constraints.
  • Structural integrity – The system needed to handle static loads, thermal movement, and expansion forces.
  • Installation speed – A fast, efficient solution was critical to keeping the project on track.

The solution: Walraven Maxx heavy-duty modular support system

Armaflo recommended the Walraven Maxx system to their client. Walraven Maxx is a high-strength, modular support system suitable for the demands of this type of installation. The Walraven Maxx system provides:

heavy duty pipe bridge

  1. Exceptional load-bearing strength – Designed for heavy-duty applications, it can handle static and dynamic loads without the risk of excessive bending or failure.
  2. Extended spanning capability – No additional anchor points were required for spanning the gap, simplifying installation.
  3. Modular & easy assembly – Pre-engineered components enabled quick, hassle-free construction.
  4. Durability – With a hot-dip galvanised finish, Walraven Maxx offers corrosion protection for outdoor installations, ensuring long-term performance and reducing maintenance.

Smooth & efficient installation

The system was quickly secured to both buildings, aligned, and fitted with insulated pipework, ensuring even load distribution. Final checks confirmed stability and minimal deflection, allowing this heavy-duty pipe bridge project to progress without delay.

If you’re facing a similar challenge, why not get in touch with our Technical Team to see how we can help?

                                    heavy duty pipe bridge

 

Let's get in touch

Product wish list 0
To top
Close

International websiteOr visit our international website.