The M&E contractor working on the Thames Tower high rise office block in Reading required advice about how to effectively support the rooftop services coming from the plant room. Walraven were approached to provide a technical design solution which was taken forward and implemented with great success.
This was a rooftop installation project to support very heavy pipework. The solution had to take into account several factors:
Our technical support team provided drawings and load calculations to recommend a combination of Walraven installation systems. This was followed up with a toolbox talk on-site.
The Walraven Maxx system is perfectly suited to supporting heavy pipework and is suitable for outdoor use. Used in combination with our expansion guides, the pipes would be effectively supported whilst allowing for thermal expansion. To provide a non-penetrative rooftop attachment, our Walraven Yeti® 480 rooftop support feet were used.
The Walraven Maxx system is a flexible, heavy-duty channel system that is safe, secure and corrosion resistant. It is suitable for many applications and is quick and easy to install without the need for on-site fabrication or welding – perfect for confined spaces.
If you have rooftop installation challenges, get in touch with our technical team for a chat.
Alternatively you can find out more about the Walraven Maxx System, or view more case studies.
Find out more about Walraven Maxx Read more case studies
